The specialised 89.5 metres long ship will be built for Rs 840 crore and is likely to be ready within the next three and a half years. It will be able to operate at a depth of nearly 6,000 metres with additional deployment of AUVs
Simple ethical design
The specialised 89.5 metres long ship will be built for Rs 840 crore and is likely to be ready within the next three and a half years. It will be able to operate at a depth of nearly 6,000 metres with additional deployment of AUVs